US-30 Nebraska
Closures, crashes, chain controls and work zones on US-30 in Nebraska, in order along the road.
US-30 in Nebraska: no full closures reported
As of 5:19 AM CST. 10 entries; latest update 4 days ago. Crashes in Nebraska are not on Live Roads yet, so this covers closures and work zones only.
Crashes, incidents and chain controls now 0
Lane closures and work zones 10
- Work zoneboth directions
US 30 in both directions: between Peterson Boulevard (near Lodgepole) and Grove Avenue (Chappell)
Since Mon, Jun 1, 6:00 AM MDT
US 30 in both directions: Between Peterson Boulevard (near Lodgepole) and Grove Avenue (Chappell). Look out for construction work. Road resurfacing is in progress. A lane is closed intermittently. A pilot car is in operation. Look out for a flagging operation. Width limit 10'0" . More Info: Hwy 30 work.jpg
Nebraska DOT (511) · NE · updated May 20, 2026
- Work zoneboth directions
US-30 to Hwy-47 Link in both directions: between US 30 and NE 47 (Gothenburg)
Since Tue, Jun 23, 7:00 AM CDT
US-30 to Hwy-47 Link in both directions: Between US 30 and NE 47 (Gothenburg). Look out for construction work. A lane is closed intermittently. Look out for a flagging operation. A pilot car is in operation. Comment: Work includes concrete pavement repair, concrete sealing, and pavement markings. More Info: 20260614-D6-61684.pdf
Nebraska DOT (511) · NE · updated October 10, 2026
- Work zoneboth directions
US 30 in both directions: between 25; West Schimmer Drive (Alda) and South North Road (Grand Island)
Since Mon, Mar 30, 5:02 PM CDT
US 30 in both directions: Between 25; West Schimmer Drive (Alda) and South North Road (Grand Island). Look out for construction work. A lane is closed intermittently. Width limit 12'0" . Comment: Weather permitting work includes building left-turn only, median surfacing, lighting, permanent pavement marking, erosion control and permanent seeding
Nebraska DOT (511) · NE · updated March 30, 2026
- Work zoneboth directions
US 30 in both directions: between West Husker Highway and Claude Road (near Grand Island)
Since Mon, Mar 30, 3:40 PM CDT
US 30 in both directions: Between West Husker Highway and Claude Road (near Grand Island). Look out for long term road construction work. Portable traffic signals in use. Width limit 12'0" . Comment: US-30 will be realigned. A new 4-lane divided urban highway section will be constructed. Monitor Road east and west of the Husker Hwy intersection will be realigned. North Road from Stauss to Reuting will be realigned. Engelman Road, Stolley Park Road and Husker Hwy intersections with the new US-30 alignment will be reconstructed. Additional work will include culverts, storm sewer, lighting, MSE w
Nebraska DOT (511) · NE · updated March 30, 2026
- Work zoneboth directions
US 30 in both directions: between North Gunbarrel Road (1 mile east of the Grand Island area) and Prairie Street…
Until Mon, Nov 30, 12:00 AM CST
US 30 in both directions: Between North Gunbarrel Road (1 mile east of the Grand Island area) and Prairie Street (Chapman). Look out for construction work. Milling work is in progress. A lane is closed intermittently. Look out for a flagging operation. Until November 30, 2026 at about 12:00AM CST. Comment: Work includes widening existing roadway surface at two locations (intersections) for left-turn lanes, milling and resurfacing the road and shoulder with asphalt, full-depth reconstruction of 4 to 2 lane transition area, and lighting and culvert work. Traffic will be maintained with lane rest
Nebraska DOT (511) · NE · updated October 8, 2026
- Work zoneboth directions
US 30 in both directions: between 14th Avenue (Central City) and NE 92 (2 miles west of the Clarks area)
Since Wed, Sep 23, 3:11 PM CDT
US 30 in both directions: Between 14th Avenue (Central City) and NE 92 (2 miles west of the Clarks area). Look out for construction work. A lane is closed intermittently. A pilot car is in operation. Look out for a flagging operation. Comment: Work includes concrete pavement repair, asphalt milling, asphalt overlay, earth shoulder, and seeding. Traffic will be maintained with flaggers and pilot vehicle. An 11-foot width restriction will be in effect. Anticipated completion is Nov. 2026.
Nebraska DOT (511) · NE · updated 5 days ago
- Work zoneboth directions
US 30 in both directions: between NE 39 (Silver Creek) and 280 Avenue (Duncan)
Since Mon, Jun 1, 7:00 AM CDT
US 30 in both directions: Between NE 39 (Silver Creek) and 280 Avenue (Duncan). Look out for construction work. Comment: Work includes milling, asphalt, culvert, sidewalk with ADA upgrades and bridge work. Traffic will be controlled with temporary traffic signals and flaggers. There will be a 12-foot width restriction for the bridge work. Anticipated completion is fall 2026.
Nebraska DOT (511) · NE · updated November 16, 2026
- Work zoneboth directions
US 30 in both directions: between US 81 and 13th Street (near Columbus)
Since Sat, Apr 4, 7:00 AM CDT
US 30 in both directions: Between US 81 and 13th Street (near Columbus). Bridge construction work is in progress. Expect changing traffic patterns. Width limit 12'0" . Until June 30, 2028 at about 6:00PM CST. Comment: Traffic will be switched, to a two-way, two-lane section in the northbound lanes.
Nebraska DOT (511) · NE · updated October 30, 2026
- Work zoneeastbound
US 30 eastbound: between US 77 and North Luther Road (3 miles west of the Fremont area)
Since Thu, Nov 19, 8:45 AM CST
US 30 eastbound: Between US 77 and North Luther Road (3 miles west of the Fremont area). Look out for bridge work. Right lane closed in the eastbound direction of travel.
Nebraska DOT (511) · NE · updated 4 days ago
- Work zoneboth directions
US 30 in both directions: between County Road 26 (near Fremont) and County Road 28 (1 mile west of the Arlington area)
Since Mon, Jun 22, 7:00 AM CDT
US 30 in both directions: Between County Road 26 (near Fremont) and County Road 28 (1 mile west of the Arlington area). Look out for construction work. There are alternating lane closures. Portable traffic signals in use. Width limit 12'0" . Speed limit 35 mph . Comment: Work includes box culvert reconstruction, pavement removals, and new concrete pavement construction Two-way traffic will be maintained with one lane in each direction using temporary traffic signals More Info: 20260608-D2-22720A.pdf
Nebraska DOT (511) · NE · updated June 26, 2026
US-30 by email, every morning
Crashes, chain controls and closures on US-30 at 6:00 AM Eastern. Free, and one click to stop.
More options: more highways, states, or Mondays only.
What we cover in Nebraska
- Work zones and lane closuresLive · State DOT work zone feeds (WZDx), State 511 systems (CARS: 511NY, INDOT, KDOT, MnDOT, MassDOT, NDOT, TDOT)
- Crashes and incidentsNot connected yet
- Chain controlsNot connected yet
About US-30 in Nebraska
US-30 is a US highway.
This page lists what Nebraska's official sources report on US-30, in order along the road: crashes and incidents, full closures, lane closures and work zones, and planned work. When a list is empty, those sources had nothing on US-30 at the last check, November 24, 2026, 5:19 AM CST.
Official sources checked in Nebraska
Crashes and incidents: Nebraska 511.Work zones and lane closures: Nebraska 511.Official traveler information: Nebraska 511.Weather alerts: National Weather Service.