US-101 Washington
Closures, crashes, chain controls and work zones on US-101 in Washington, in order along the road.
US-101 in Washington: no full closures reported
As of 9:33 PM PDT. 17 entries; latest update 3 min ago.
Crashes, incidents and chain controls now 0
Lane closures and work zones 16
- Work zonenorthbound
The climbing lane on northbound US 101 approaching Cosi Hill is closed
Since Jan 13, 2025, 10:39 AM PST
The climbing lane on northbound US 101 approaching Cosi Hill is closed. · Medium impact
WSDOT · WA · updated January 13, 2025
- Work zonenorthbound
US-101: From 9 a.m
Since Mon, Oct 5, 9:00 AM PDT
From 9 a.m. to 2:30 p.m. Monday, Oct. 19, the Simpson Avenue bridge will close to all travelers for a routine inspection. The US 101 Riverside Bridge will be reconfigured to accommodate two-way travel while work is underway. Travelers can expect congestion while the detour is in place. Read the travel advisory . · Medium impact
WSDOT · WA · updated 4 days ago
- Work zonesouthbound
US-101: Contract - XE3705 One way alternate "Pilot or Flagger" controlled traffic control for s…
Since Sun, Jun 21, 5:00 PM PDT
Contract - XE3705 One way alternate "Pilot or Flagger" controlled traffic control for striping.
State DOT work zone feeds (WZDx) · WA · updated September 30, 2026
- Work zonenorthbound
US-101: Contract - XE3705 One way alternate "Pilot or Flagger" controlled traffic control for s…
Since Sun, Jun 21, 5:00 PM PDT
Contract - XE3705 One way alternate "Pilot or Flagger" controlled traffic control for striping.
State DOT work zone feeds (WZDx) · WA · updated September 30, 2026
- Work zone
Expect US 101 intermittent daytime lane reductions from 6 a.m
Since Fri, Oct 9, 9:31 PM PDT
Expect US 101 intermittent daytime lane reductions from 6 a.m. to 7 p.m. Monday through Friday between Ocean Beach Road and the Jefferson County line. Crews will apply permanent pavement markings and grind rumble strips, as weather permits. More info on the project webpage · Medium impact
WSDOT · WA · updated 3 min ago
- Work zone
Expect temporary traffic lights and single-lane alternating traffic around the clock on US 101 near Ruby Beach
Since Fri, Oct 9, 9:31 PM PDT
Expect temporary traffic lights and single-lane alternating traffic around the clock on US 101 near Ruby Beach. The speed limit is reduced from 55 mph to 25 mph from milepost 162.93 to 163.51. Work is for a fish passage project . · Medium impact
WSDOT · WA · updated 3 min ago
- Work zone
US-101: Reduced speeds and one-way alternating traffic controlled by a signal is in place until further notice on US…
Since Fri, Apr 3, 6:43 AM PDT
Reduced speeds and one-way alternating traffic controlled by a signal is in place until further notice on US 101 near Cedar Creek at milepost 165. · High impact
WSDOT · WA · updated April 3, 2026
- Work zone
Travelers will need to prepare for around-the-clock closures at the US 101 Hoh River Bridge
Since Fri, Oct 9, 9:31 PM PDT
Travelers will need to prepare for around-the-clock closures at the US 101 Hoh River Bridge. From 5 a.m. Thursday, Oct. 8 to noon Tuesday, Oct. 13, the US 101 Hoh River Bridge will close to all traffic for emergency repairs . The bridge will also close at 7 p.m. each night Tuesday, Oct. 13 through Sunday, Oct. 18 and reopen at 5:30 a.m. each following morning. · Medium impact
WSDOT · WA · updated 3 min ago
- Work zonesouthbound
US-101: Contract - Hoh River Bridge
Since Wed, Oct 7, 5:00 PM PDT
Contract - Hoh River Bridge
State DOT work zone feeds (WZDx) · WA · updated 1 day ago
- Work zonenorthbound
US-101: Contract - Hoh River Bridge
Since Wed, Oct 7, 5:00 PM PDT
Contract - Hoh River Bridge
State DOT work zone feeds (WZDx) · WA · updated 1 day ago
- Work zoneboth directions
Closure on US 101 both directions at milepost 177 near Hoh River beginning at 5:03 am on October 8, 2026…
Since Thu, Oct 8, 5:07 AM PDT
Closure on US 101 both directions at milepost 177 near Hoh River beginning at 5:03 am on October 8, 2026 until about 12:00 pm on October 13, 2026. Road is closed. There are no detours available. · Highest impact
WSDOT · WA · updated 1 day ago
- Work zone
US-101: Expect around-the-clock single-lane alternating traffic approaching milepost 184 near Dowans Creek Road
Since Tue, Apr 14, 5:09 PM PDT
Expect around-the-clock single-lane alternating traffic approaching milepost 184 near Dowans Creek Road. The road is reduced to one lane until permanent repairs are completed due to a slide. · Medium impact
WSDOT · WA · updated April 14, 2026
- Work zone
Expect around-the-clock single-lane alternating traffic on US 101 at the Jefferson-Clallam county line
Since Fri, Oct 9, 9:31 PM PDT
Expect around-the-clock single-lane alternating traffic on US 101 at the Jefferson-Clallam county line. The speed limit is reduced to 25 mph between mileposts 184 and 185. Crews are building a bridge to improve fish passage in May Creek . · Medium impact
WSDOT · WA · updated 3 min ago
- Work zoneboth directions
Road work on US 101 both directions at milepost 189 near Mansfield Rd beginning at 11:39 am on September 9…
Since Fri, Oct 9, 1:41 PM PDT
Road work on US 101 both directions at milepost 189 near Mansfield Rd beginning at 11:39 am on September 9, 2026 until further notice. · High impact
WSDOT · WA · updated 7 hr ago
- Work zonesouthbound
US-101: Contract - 009567 Site 4
Since Wed, Oct 7, 5:00 PM PDT
Contract - 009567 Site 4
State DOT work zone feeds (WZDx) · WA · updated 21 hr ago
- Work zonenorthbound
US-101: Contract - 009567 Site 4
Since Wed, Oct 7, 5:00 PM PDT
Contract - 009567 Site 4
State DOT work zone feeds (WZDx) · WA · updated 21 hr ago
Planned work 1
US-101 by email, every morning
Crashes, chain controls and closures on US-101 at 6:00 AM Eastern. Free, and one click to stop.
More options: more highways, states, or Mondays only.
What we cover in Washington
- Work zones and lane closuresLive · State DOT work zone feeds (WZDx), Oregon DOT (TripCheck), WSDOT
- Crashes and incidentsLive · State DOT work zone feeds (WZDx), Oregon DOT (TripCheck), WSDOT
- Chain controlsLive · State DOT work zone feeds (WZDx), Oregon DOT (TripCheck), WSDOT