I-94 North Dakota
Closures, crashes, chain controls and work zones on I-94 in North Dakota, in order along the road.
I-94 in North Dakota: no full closures reported
As of 1:57 PM CDT. 7 entries; latest update 1 day ago. Crashes in North Dakota are not on Live Roads yet, so this covers closures and work zones only.
Crashes, incidents and chain controls now 0
Lane closures and work zones 7
- Work zoneeastbound
I-94: Shoulder closure near Exit 23 in EB lanes.
Since Sun, Sep 6, 11:00 PM MDT
Shoulder closure near Exit 23 in EB lanes. Work in ditch areas.
State DOT work zone feeds (WZDx) · ND · updated September 14, 2026
- Lane closureeastbound
I-94: Traffic is reduced to a signal lane for both the westbound and eastbound directions whi…
Since Mon, Mar 30, 12:00 AM CDT
Traffic is reduced to a signal lane for both the westbound and eastbound directions while median work is completed. Speed will be reduced in the work area. Watch for slow exiting construction traffic.
State DOT work zone feeds (WZDx) · ND · updated September 28, 2026
- Lane closureeastbound
I-94: Temporary ramp connections are being constructed at the McKenzie and Sterling Interchan…
Since Fri, Jul 24, 12:00 AM CDT
Temporary ramp connections are being constructed at the McKenzie and Sterling Interchanges.
State DOT work zone feeds (WZDx) · ND · updated August 10, 2026
- Lane closureeastbound
I-94: Two-way head-to-head traffic is in effect on the westbound lanes of the interstate for…
Since Mon, May 18, 12:00 AM CDT
Two-way head-to-head traffic is in effect on the westbound lanes of the interstate for both eastbound and westbound vehicles. Follow all traffic control signs and devices. Slow down and use caution through the work zone.
State DOT work zone feeds (WZDx) · ND · updated September 22, 2026
- Work zoneeastbound
East Bound I-94 shoulder closure with a speed reduction through the project.
Since Thu, May 7, 12:00 AM CDT
East Bound I-94 shoulder closure with a speed reduction through the project. Crews will be working in the median and the shoulder. Pay attention to the construction signs and drive with caution.
State DOT work zone feeds (WZDx) · ND · updated August 28, 2026
- Lane closureeastbound
I-94 construction for Fm Diversion work at RP 341 to RP 343.
Since Mon, Jun 15, 12:00 AM CDT
I-94 construction for FM Diversion work at RP 341 to RP 343.
State DOT work zone feeds (WZDx) · ND · updated 2 days ago
- Work zoneeastbound
I-94: Eastbound: No traffic control on Eastbound roadway.
Since Mon, Jul 6, 12:00 AM CDT
EASTBOUND: No traffic control on Eastbound roadway. WESTBOUND: The left lane of Westbound I94 from RP 350.5 to 347.489 is closed for pavement repairs. Traffic is maintained in the right lane and right shoulder between RP 350 and 347.489 Width is restricted to 11 feet wide. Speed limit is reduced to 40mph through the work zone.
State DOT work zone feeds (WZDx) · ND · updated 1 day ago
I-94 by email, every morning
Crashes, chain controls and closures on I-94 at 6:00 AM Eastern. Free, and one click to stop.
More options: more highways, states, or Mondays only.
What we cover in North Dakota
- Work zones and lane closuresLive · State DOT work zone feeds (WZDx)
- Crashes and incidentsNot connected yet
- Chain controlsNot connected yet