I-75 Ohio
Closures, crashes, chain controls and work zones on I-75 in Ohio, in order along the road.
I-75 in Ohio: 1 full closure now
As of 1:54 PM EDT. 39 entries; latest update 2 min ago.
Crashes, incidents and chain controls now 2
- Lane closurenorthbound
Crash, I-75 Northbound
Since Fri, Oct 9, 1:34 PM EDT
The right shoulder is blocked on I-75 North at Mitchell Ave, due to a crash. · Road status: Restricted
ODOT (OHGO) · OH · updated 2 min ago
- Lane closuresouthbound
Disabled Vehicle, I-75 Southbound
Since Fri, Oct 9, 1:52 PM EDT
The right lane is blocked on I-75 South at Stanley Ave, due to a disabled vehicle. · Road status: Restricted
ODOT (OHGO) · OH · updated 2 min ago
Fully closed for work now 1
Lane closures and work zones 36
- Ramp closuresouthbound
I-75: Ramp from RA 31470 to RA 31472
Since Tue, Jun 30, 12:00 AM EDT
On or after Tuesday, June 30, the ramp from I-75 South to Second Street (Exit 1A) will be closed at 11 p.m. to start demolition. Traffic will be detoured by way of W. 5th Street (Exit 1C) and Race Street to Second Street. This is a permanent closure, and the ramp will be replaced with a new ramp to 3rd Street, with access to 2nd Street.
State DOT work zone feeds (WZDx) · OH · updated June 30, 2026
- Ramp closuresouthbound
I-75: Ramp from RA 31470 to RA 31472
Since Tue, Jun 30, 12:00 AM EDT
On or after Tuesday, June 30, the ramp from I-75 South to Second Street (Exit 1A) will be closed at 11 p.m. to start demolition. Traffic will be detoured by way of W. 5th Street (Exit 1C) and Race Street to Second Street. This is a permanent closure, and the ramp will be replaced with a new ramp to 3rd Street, with access to 2nd Street.
State DOT work zone feeds (WZDx) · OH · updated June 30, 2026
- Ramp closureeastbound
I-75: The ramp from U.S.
Since Sun, Sep 27, 12:00 AM EDT
The ramp from U.S. 50 East (Sixth Street Viaduct) to I-75 South will be closed through late January 2027 for reconstruction as part of the Brent Spence Bridge Corridor project. Motorists can follow Fifth Street to Race Street and Third Street to access I-75 South.
State DOT work zone feeds (WZDx) · OH · updated September 25, 2026
- Ramp closurenorthbound
I-75: Ramp from MR 2158 Mound St to MR 8565 Winchell Ave
Since Sun, Feb 15, 12:00 AM EST
Beginning Sunday, February 15, the ramp to Winchell Avenue from I-75 North, 9th Street and 6th Street will be closed through May 2029. There will be no signed detour for Winchell Avenue. Motorists from 9th Street to I-75 North will be detoured via 8th Street and Freeman Avenue to I-75. Access from 6th Street to Winchell will be closed with a right-lane closure on the ramp.
State DOT work zone feeds (WZDx) · OH · updated February 10, 2026
- Ramp closuresouthbound
The ramp from Western Avenue to I-75 South is closed as part of the Linn Street Bridge…
Since Fri, Apr 17, 12:00 AM EDT
The ramp from Western Avenue to I-75 South is closed as part of the Linn Street Bridge reconstruction project. This is a permanent closure. The ramp is closed, and motorists may follow Freeman Avenue and the 6th Street/U.S. 50/River Road.
State DOT work zone feeds (WZDx) · OH · updated April 24, 2026
- Lane closureeastbound
I-75: Norwood Lateral EB
Since Sep 9, 2024, 12:00 AM EDT
Replacement of three railroad bridges located over Prosser Avenue, I-75, and SR 562 and minor realignment of I-75 lanes to accommodate railroad bridge piers. Various lane closures will be in effect on I-75, as well as on S.R. 562, as work progresses on the structures over these routes.
State DOT work zone feeds (WZDx) · OH · updated July 13, 2026
- Lane closurenorthbound
Replacement of three railroad bridges located over Prosser Avenue, I-75, and SR 562 and…
Since Sep 9, 2024, 12:00 AM EDT
Replacement of three railroad bridges located over Prosser Avenue, I-75, and SR 562 and minor realignment of I-75 lanes to accommodate railroad bridge piers. Various lane closures will be in effect on I-75, as well as on S.R. 562, as work progresses on the structures over these routes.
State DOT work zone feeds (WZDx) · OH · updated July 13, 2026
- Lane closurenorthbound
I-75: Prosser Ave
Since Sep 9, 2024, 12:00 AM EDT
Replacement of three railroad bridges located over Prosser Avenue, I-75, and SR 562 and minor realignment of I-75 lanes to accommodate railroad bridge piers. Various lane closures will be in effect on I-75, as well as on S.R. 562, as work progresses on the structures over these routes.
State DOT work zone feeds (WZDx) · OH · updated July 13, 2026
- Lane closurenorthbound
Widening of I-75 N/S between S.R.
Since Jun 1, 2025, 8:00 PM EDT
Widening of I-75 N/S between S.R. 126/RRCC and Towne Street. Traffic will be maintained with intermittent lane restrictions during evening and overnight hours. Ramp closures may also be in effect at various times. The pedestrian bridge over I-75, between Section Road and City Centre Drive will be closed throughout the project, and Summit Road will be closed effective October 20, 2025 for up to …
State DOT work zone feeds (WZDx) · OH · updated October 7, 2025
- Lane closuresouthbound
Widening of I-75 N/S between S.R.
Since Jun 1, 2025, 8:00 PM EDT
Widening of I-75 N/S between S.R. 126/RRCC and Towne Street. Traffic will be maintained with intermittent lane restrictions during evening and overnight hours. Ramp closures may also be in effect at various times. The pedestrian bridge over I-75, between Section Road and City Centre Drive will be closed throughout the project, and Summit Road will be closed effective October 20, 2025 for up to …
State DOT work zone feeds (WZDx) · OH · updated October 7, 2025
- Work zonenorthbound
I-75: Phase 8B of the Mill Creek Expressway Project.
Since Jun 5, 2024, 7:00 PM EDT
Phase 8B of the Mill Creek Expressway Project. Project will construct a new Pump Station and Combined Sewer Overflow for the widening of IR 75. Phases 8+8C widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 56 2 interchange, remove the Towne Ave. interchange, complete minor improvements to the Paddock Road interchange, and tie into the existing SR 126…
State DOT work zone feeds (WZDx) · OH · updated January 16, 2026
- Lane closureeastbound
I-75: Citycentre Dr
Since Sep 3, 2025, 12:00 AM EDT
The pedestrian bridge over I-75, between Section Road and City Centre Drive, is closed for reconstruction. Users will be detoured via Summit and Paddock roads.
State DOT work zone feeds (WZDx) · OH · updated September 3, 2025
- Lane closurenorthbound
A longitudinal joint repair project on I-75 North and South, between S.R.
Since Tue, Sep 8, 9:30 PM EDT
A longitudinal joint repair project on I-75 North and South, between S.R. 129 in Butler County and Pennyroyal Road in Warren County. Traffic will be maintained in a minimum of one, 12-foot lane in either direction during late evening and overnight hours.
State DOT work zone feeds (WZDx) · OH · updated August 26, 2026
- Lane closuresouthbound
A longitudinal joint repair project on I-75 North and South, between S.R.
Since Tue, Sep 8, 9:30 PM EDT
A longitudinal joint repair project on I-75 North and South, between S.R. 129 in Butler County and Pennyroyal Road in Warren County. Traffic will be maintained in a minimum of one, 12-foot lane in either direction during late evening and overnight hours.
State DOT work zone feeds (WZDx) · OH · updated August 26, 2026
- Lane closurenorthbound
A longitudinal joint repair project on I-75 North and South, between S.R.
Since Tue, Sep 8, 9:30 PM EDT
A longitudinal joint repair project on I-75 North and South, between S.R. 129 in Butler County and Pennyroyal Road in Warren County. Traffic will be maintained in a minimum of one, 12-foot lane in either direction during late evening and overnight hours.
State DOT work zone feeds (WZDx) · OH · updated August 26, 2026
- Lane closuresouthbound
A longitudinal joint repair project on I-75 North and South, between S.R.
Since Tue, Sep 8, 9:30 PM EDT
A longitudinal joint repair project on I-75 North and South, between S.R. 129 in Butler County and Pennyroyal Road in Warren County. Traffic will be maintained in a minimum of one, 12-foot lane in either direction during late evening and overnight hours.
State DOT work zone feeds (WZDx) · OH · updated August 26, 2026
- Lane closurenorthbound
I-75 in both directions will be subject to overnight lane restrictions between Lyons Ro…
Since Fri, Jul 31, 7:00 PM EDT
I-75 in both directions will be subject to overnight lane restrictions between Lyons Road and Pennyroyal Road from 7:30 p.m. through 5 a.m. starting Friday, July 31through November 2026.
State DOT work zone feeds (WZDx) · OH · updated September 30, 2026
- Work zonenorthbound
On Friday, July 24, the contractor will begin shifting I-75 North between Lyons and Pen…
Since Fri, Jul 24, 12:00 AM EDT
On Friday, July 24, the contractor will begin shifting I-75 North between Lyons and Pennyroyal to the right in order to install barrier wall. During the shift, motorists traveling North on I-75 will not have access to the entrance or exit ramps at Austin Landing Boulevard and the interchange at I-75/I-675. This work is expected to be completed by mid-morning, Saturday, July 25, and access will …
State DOT work zone feeds (WZDx) · OH · updated July 24, 2026
- Lane closuresouthbound
I-75 in both directions will be subject to overnight lane restrictions between Lyons Ro…
Since Fri, Jul 31, 7:00 PM EDT
I-75 in both directions will be subject to overnight lane restrictions between Lyons Road and Pennyroyal Road from 7:30 p.m. through 5 a.m. starting Friday, July 31through November 2026.
State DOT work zone feeds (WZDx) · OH · updated September 30, 2026
- Work zonesouthbound
The left lane on I-75 South will be reduced to 11’ between Lyons Road and Pennyroyal Ro…
Since Thu, Jul 23, 12:00 AM EDT
The left lane on I-75 South will be reduced to 11’ between Lyons Road and Pennyroyal Road starting Friday, July 24 through Spring 2027. Crews will be preparing for next phase of construction.
State DOT work zone feeds (WZDx) · OH · updated July 24, 2026
- Lane closuresouthbound
I-75 in both directions will be subject to overnight lane restrictions between Lyons Ro…
Since Fri, Jul 31, 7:00 PM EDT
I-75 in both directions will be subject to overnight lane restrictions between Lyons Road and Pennyroyal Road from 7:30 p.m. through 5 a.m. starting Friday, July 31through November 2026.
State DOT work zone feeds (WZDx) · OH · updated September 30, 2026
- Work zonesouthbound
The left lane on I-75 South will be reduced to 11’ between Lyons Road and Pennyroyal Ro…
Since Thu, Jul 23, 12:00 AM EDT
The left lane on I-75 South will be reduced to 11’ between Lyons Road and Pennyroyal Road starting Friday, July 24 through Spring 2027. Crews will be preparing for next phase of construction.
State DOT work zone feeds (WZDx) · OH · updated July 24, 2026
- Lane closurenorthbound
I-75 in both directions will be subject to overnight lane restrictions between Lyons Ro…
Since Fri, Jul 31, 7:00 PM EDT
I-75 in both directions will be subject to overnight lane restrictions between Lyons Road and Pennyroyal Road from 7:30 p.m. through 5 a.m. starting Friday, July 31through November 2026.
State DOT work zone feeds (WZDx) · OH · updated September 30, 2026
- Work zonenorthbound
On Friday, July 24, the contractor will begin shifting I-75 North between Lyons and Pen…
Since Fri, Jul 24, 12:00 AM EDT
On Friday, July 24, the contractor will begin shifting I-75 North between Lyons and Pennyroyal to the right in order to install barrier wall. During the shift, motorists traveling North on I-75 will not have access to the entrance or exit ramps at Austin Landing Boulevard and the interchange at I-75/I-675. This work is expected to be completed by mid-morning, Saturday, July 25, and access will …
State DOT work zone feeds (WZDx) · OH · updated July 24, 2026
- Lane closurenorthbound
I-75 at Alex Bell Road will be subject to lane restrictions between from 8 p.m.
Since Wed, Aug 26, 8:00 PM EDT
I-75 at Alex Bell Road will be subject to lane restrictions between from 8 p.m. to 6 a.m. starting Wednesday, August 26. Crews will be repairing the roadway/bridge.
State DOT work zone feeds (WZDx) · OH · updated 1 day ago
- Work zonenorthbound
I-75 North will be subject to right shoulder closures daily from Tuesday, October 6 thr…
Since Tue, Oct 6, 7:30 AM EDT
I-75 North will be subject to right shoulder closures daily from Tuesday, October 6 through Friday, October 9 under the US-35 ramps in addition to US 35 to I-75 North ramps width narrowed while repair work is performed on the interchange bridge.
State DOT work zone feeds (WZDx) · OH · updated 1 day ago
- Work zonenorthbound
Northbound I-75 between Needmore Road and Leo Street will be subject to intermittent l…
Since Thu, Sep 10, 12:00 AM EDT
Northbound I-75 between Needmore Road and Leo Street will be subject to intermittent lane closures overnight while contractors work to reopen the left lane on Sunday, September 13. Early Monday, September 14, Northbound I-75 will be back to three travel lanes, but will remain shifted to the exterior/outside. Southbound I-75 will remain in its current pattern. This pattern is expected to remain …
State DOT work zone feeds (WZDx) · OH · updated August 28, 2026
- Ramp closuresouthbound
The Ramp from Wagner-Ford Road to I-75 South will be closed .This closure is necessary…
Since Aug 24, 2024, 12:00 AM EDT
The Ramp from Wagner-Ford Road to I-75 South will be closed .This closure is necessary to reconstruct I-75 in this area.
State DOT work zone feeds (WZDx) · OH · updated April 15, 2026
- Work zoneeastbound
I-75: Campbell Rd
Since Mar 4, 2025, 7:00 AM EST
Expect intermittent lane closures on Campbell Road in both directions at I-75 from Tuesday, March 4 through December 2025. Crews will be replacing the bridge.
State DOT work zone feeds (WZDx) · OH · updated March 4, 2026
- Work zonenorthbound
Expect two lanes on I-75 in each direction between Russell Road and Fair Road.
Since Sun, Mar 29, 12:00 AM EDT
Expect two lanes on I-75 in each direction between Russell Road and Fair Road. Southbound traffic in the left lane will cross over into a contraflow lane on the northbound side just south of Russell Road starting Sunday, March 29 through December 2026. Motorists in the contraflow lane will not have access to exit at SR 47/Michigan Street or Fair Road. Crews will be reconstructing the bridges ov…
State DOT work zone feeds (WZDx) · OH · updated July 9, 2026
- Work zonesouthbound
Expect two lanes on I-75 in each direction between Russell Road and Fair Road.
Since Sun, Mar 29, 12:00 AM EDT
Expect two lanes on I-75 in each direction between Russell Road and Fair Road. Southbound traffic in the left lane will cross over into a contraflow lane on the northbound side just south of Russell Road starting Sunday, March 29 through December 2026. Motorists in the contraflow lane will not have access to exit at SR 47/Michigan Street or Fair Road. Crews will be reconstructing the bridges ov…
State DOT work zone feeds (WZDx) · OH · updated July 9, 2026
- Lane closurenorthbound
I-75: paving is complete.
Since Fri, Jul 24, 12:00 AM EDT
paving is complete. Traffic impacts are possible for finish work such as striping and reflective pavement markers.
State DOT work zone feeds (WZDx) · OH · updated October 1, 2026
- Lane closuresouthbound
I-75: paving is complete.
Since Fri, Jul 24, 12:00 AM EDT
paving is complete. Traffic impacts are possible for finish work such as striping and reflective pavement markers.
State DOT work zone feeds (WZDx) · OH · updated October 1, 2026
- Lane closuresouthbound
I-75: Paving is complete.
Since Fri, Jul 24, 6:00 PM EDT
Paving is complete. Traffic impacts are possible for finish work such as striping and reflective pavement markers.
State DOT work zone feeds (WZDx) · OH · updated October 1, 2026
- Lane closurenorthbound
I-75: Paving is complete.
Since Fri, Jul 24, 6:00 PM EDT
Paving is complete. Traffic impacts are possible for finish work such as striping and reflective pavement markers.
State DOT work zone feeds (WZDx) · OH · updated October 1, 2026
- Lane closuresouthbound
Southbound I-75 near Bays Road, south of U.S.
Since Mon, Oct 5, 12:00 AM EDT
Southbound I-75 near Bays Road, south of U.S. 6, will experience right lane and shoulder closure for a slope repair beginning Monday, Oct. 5 through mid-November.
State DOT work zone feeds (WZDx) · OH · updated October 2, 2026
I-75 by email, every morning
Crashes, chain controls and closures on I-75 at 6:00 AM Eastern. Free, and one click to stop.
More options: more highways, states, or Mondays only.
What we cover in Ohio
- Work zones and lane closuresLive · State DOT work zone feeds (WZDx), ODOT (OHGO)
- Crashes and incidentsLive · State DOT work zone feeds (WZDx), ODOT (OHGO)
- Chain controlsNot connected yet