I-75 Ohio
Closures, crashes, chain controls and work zones on I-75 in Ohio, in order along the road.
I-75 in Ohio: 1 full closure now
As of 5:14 AM EST. 39 entries; latest update 3 days ago.
Crashes, incidents and chain controls now 0
Fully closed for work now 1
Lane closures and work zones 38
- Ramp closuresouthbound
I-75: Ramp from RA 31470 to RA 31472
Since Tue, Jun 30, 12:00 AM EDT
On or after Tuesday, June 30, the ramp from I-75 South to Second Street (Exit 1A) will be closed at 11 p.m. to start demolition. Traffic will be detoured by way of W. 5th Street (Exit 1C) and Race Street to Second Street. This is a permanent closure, and the ramp will be replaced with a new ramp to 3rd Street, with access to 2nd Street.
State DOT work zone feeds (WZDx) · OH · updated June 30, 2026
- Ramp closuresouthbound
I-75: Ramp from RA 31470 to RA 31472
Since Tue, Jun 30, 12:00 AM EDT
On or after Tuesday, June 30, the ramp from I-75 South to Second Street (Exit 1A) will be closed at 11 p.m. to start demolition. Traffic will be detoured by way of W. 5th Street (Exit 1C) and Race Street to Second Street. This is a permanent closure, and the ramp will be replaced with a new ramp to 3rd Street, with access to 2nd Street.
State DOT work zone feeds (WZDx) · OH · updated June 30, 2026
- Ramp closureeastbound
I-75: The ramp from U.S.
Since Sun, Sep 27, 12:00 AM EDT
The ramp from U.S. 50 East (Sixth Street Viaduct) to I-75 South will be closed through late January 2027 for reconstruction as part of the Brent Spence Bridge Corridor project. Motorists can follow Fifth Street to Race Street and Third Street to access I-75 South.
State DOT work zone feeds (WZDx) · OH · updated September 25, 2026
- Ramp closurenorthbound
I-75: Ramp from MR 2158 Mound St to MR 8565 Winchell Ave
Since Sun, Feb 15, 12:00 AM EST
Beginning Sunday, February 15, the ramp to Winchell Avenue from I-75 North, 9th Street and 6th Street will be closed through May 2029. There will be no signed detour for Winchell Avenue. Motorists from 9th Street to I-75 North will be detoured via 8th Street and Freeman Avenue to I-75. Access from 6th Street to Winchell will be closed with a right-lane closure on the ramp.
State DOT work zone feeds (WZDx) · OH · updated February 10, 2026
- Ramp closuresouthbound
The ramp from Western Avenue to I-75 South is closed as part of the Linn Street Bridge…
Since Fri, Apr 17, 12:00 AM EDT
The ramp from Western Avenue to I-75 South is closed as part of the Linn Street Bridge reconstruction project. This is a permanent closure. The ramp is closed, and motorists may follow Freeman Avenue and the 6th Street/U.S. 50/River Road.
State DOT work zone feeds (WZDx) · OH · updated April 24, 2026
- Lane closureeastbound
I-75: Norwood Lateral EB
Since Sep 9, 2024, 12:00 AM EDT
Replacement of three railroad bridges located over Prosser Avenue, I-75, and SR 562 and minor realignment of I-75 lanes to accommodate railroad bridge piers. Various lane closures will be in effect on I-75, as well as on S.R. 562, as work progresses on the structures over these routes.
State DOT work zone feeds (WZDx) · OH · updated July 13, 2026
- Lane closurenorthbound
Replacement of three railroad bridges located over Prosser Avenue, I-75, and SR 562 and…
Since Sep 9, 2024, 12:00 AM EDT
Replacement of three railroad bridges located over Prosser Avenue, I-75, and SR 562 and minor realignment of I-75 lanes to accommodate railroad bridge piers. Various lane closures will be in effect on I-75, as well as on S.R. 562, as work progresses on the structures over these routes.
State DOT work zone feeds (WZDx) · OH · updated July 13, 2026
- Lane closurenorthbound
I-75: Prosser Ave
Since Sep 9, 2024, 12:00 AM EDT
Replacement of three railroad bridges located over Prosser Avenue, I-75, and SR 562 and minor realignment of I-75 lanes to accommodate railroad bridge piers. Various lane closures will be in effect on I-75, as well as on S.R. 562, as work progresses on the structures over these routes.
State DOT work zone feeds (WZDx) · OH · updated July 13, 2026
- Lane closurenorthbound
Widening of I-75 N/S between S.R.
Since Jun 1, 2025, 8:00 PM EDT
Widening of I-75 N/S between S.R. 126/RRCC and Towne Street. Traffic will be maintained with intermittent lane restrictions during evening and overnight hours. Ramp closures may also be in effect at various times. The pedestrian bridge over I-75, between Section Road and City Centre Drive will be closed throughout the project, and Summit Road will be closed effective October 20, 2025 for up to …
State DOT work zone feeds (WZDx) · OH · updated October 7, 2025
- Lane closuresouthbound
Widening of I-75 N/S between S.R.
Since Jun 1, 2025, 8:00 PM EDT
Widening of I-75 N/S between S.R. 126/RRCC and Towne Street. Traffic will be maintained with intermittent lane restrictions during evening and overnight hours. Ramp closures may also be in effect at various times. The pedestrian bridge over I-75, between Section Road and City Centre Drive will be closed throughout the project, and Summit Road will be closed effective October 20, 2025 for up to …
State DOT work zone feeds (WZDx) · OH · updated October 7, 2025
- Work zonenorthbound
I-75: Phase 8B of the Mill Creek Expressway Project.
Since Jun 5, 2024, 7:00 PM EDT
Phase 8B of the Mill Creek Expressway Project. Project will construct a new Pump Station and Combined Sewer Overflow for the widening of IR 75. Phases 8+8C widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 56 2 interchange, remove the Towne Ave. interchange, complete minor improvements to the Paddock Road interchange, and tie into the existing SR 126…
State DOT work zone feeds (WZDx) · OH · updated January 16, 2026
- Lane closureeastbound
I-75: Citycentre Dr
Since Sep 3, 2025, 12:00 AM EDT
The pedestrian bridge over I-75, between Section Road and City Centre Drive, is closed for reconstruction. Users will be detoured via Summit and Paddock roads.
State DOT work zone feeds (WZDx) · OH · updated September 3, 2025
- Work zonenorthbound
Rehabilitation of the bridge on northbound I-75 over Mill Creek, Benson Street and Shep…
Since Mon, Jan 12, 8:00 PM EST
Rehabilitation of the bridge on northbound I-75 over Mill Creek, Benson Street and Shepherd Lane, as well as resurfacing I-75 North South through the Lockland Split.
State DOT work zone feeds (WZDx) · OH · updated 6 days ago
- Lane closurenorthbound
A longitudinal joint repair project on I-75 North and South, between S.R.
Since Tue, Sep 8, 9:30 PM EDT
A longitudinal joint repair project on I-75 North and South, between S.R. 129 in Butler County and Pennyroyal Road in Warren County. Traffic will be maintained in a minimum of one, 12-foot lane in either direction during late evening and overnight hours.
State DOT work zone feeds (WZDx) · OH · updated August 26, 2026
- Lane closuresouthbound
A longitudinal joint repair project on I-75 North and South, between S.R.
Since Tue, Sep 8, 9:30 PM EDT
A longitudinal joint repair project on I-75 North and South, between S.R. 129 in Butler County and Pennyroyal Road in Warren County. Traffic will be maintained in a minimum of one, 12-foot lane in either direction during late evening and overnight hours.
State DOT work zone feeds (WZDx) · OH · updated August 26, 2026
- Lane closurenorthbound
A longitudinal joint repair project on I-75 North and South, between S.R.
Since Tue, Sep 8, 9:30 PM EDT
A longitudinal joint repair project on I-75 North and South, between S.R. 129 in Butler County and Pennyroyal Road in Warren County. Traffic will be maintained in a minimum of one, 12-foot lane in either direction during late evening and overnight hours.
State DOT work zone feeds (WZDx) · OH · updated August 26, 2026
- Lane closuresouthbound
A longitudinal joint repair project on I-75 North and South, between S.R.
Since Tue, Sep 8, 9:30 PM EDT
A longitudinal joint repair project on I-75 North and South, between S.R. 129 in Butler County and Pennyroyal Road in Warren County. Traffic will be maintained in a minimum of one, 12-foot lane in either direction during late evening and overnight hours.
State DOT work zone feeds (WZDx) · OH · updated August 26, 2026
- Lane closurenorthbound
I-75 in both directions will be subject to overnight lane restrictions between Lyons Ro…
Since Fri, Jul 31, 7:00 PM EDT
I-75 in both directions will be subject to overnight lane restrictions between Lyons Road and Pennyroyal Road from 7:30 p.m. through 5 a.m.
State DOT work zone feeds (WZDx) · OH · updated 6 days ago
- Work zonenorthbound
On Friday, July 24, the contractor will begin shifting I-75 North between Lyons and Pen…
Since Fri, Jul 24, 12:00 AM EDT
On Friday, July 24, the contractor will begin shifting I-75 North between Lyons and Pennyroyal to the right in order to install barrier wall. During the shift, motorists traveling North on I-75 will not have access to the entrance or exit ramps at Austin Landing Boulevard and the interchange at I-75/I-675. This work is expected to be completed by mid-morning, Saturday, July 25, and access will …
State DOT work zone feeds (WZDx) · OH · updated July 24, 2026
- Lane closuresouthbound
I-75 in both directions will be subject to overnight lane restrictions between Lyons Ro…
Since Fri, Jul 31, 7:00 PM EDT
I-75 in both directions will be subject to overnight lane restrictions between Lyons Road and Pennyroyal Road from 7:30 p.m. through 5 a.m.
State DOT work zone feeds (WZDx) · OH · updated 6 days ago
- Work zonesouthbound
The left lane on I-75 South will be reduced to 11’ between Lyons Road and Pennyroyal Ro…
Since Thu, Jul 23, 12:00 AM EDT
The left lane on I-75 South will be reduced to 11’ between Lyons Road and Pennyroyal Road starting Friday, July 24 through Spring 2027. Crews will be preparing for next phase of construction.
State DOT work zone feeds (WZDx) · OH · updated July 24, 2026
- Lane closuresouthbound
I-75 in both directions will be subject to overnight lane restrictions between Lyons Ro…
Since Fri, Jul 31, 7:00 PM EDT
I-75 in both directions will be subject to overnight lane restrictions between Lyons Road and Pennyroyal Road from 7:30 p.m. through 5 a.m.
State DOT work zone feeds (WZDx) · OH · updated 6 days ago
- Work zonesouthbound
The left lane on I-75 South will be reduced to 11’ between Lyons Road and Pennyroyal Ro…
Since Thu, Jul 23, 12:00 AM EDT
The left lane on I-75 South will be reduced to 11’ between Lyons Road and Pennyroyal Road starting Friday, July 24 through Spring 2027. Crews will be preparing for next phase of construction.
State DOT work zone feeds (WZDx) · OH · updated July 24, 2026
- Lane closurenorthbound
I-75 in both directions will be subject to overnight lane restrictions between Lyons Ro…
Since Fri, Jul 31, 7:00 PM EDT
I-75 in both directions will be subject to overnight lane restrictions between Lyons Road and Pennyroyal Road from 7:30 p.m. through 5 a.m.
State DOT work zone feeds (WZDx) · OH · updated 6 days ago
- Work zonenorthbound
On Friday, July 24, the contractor will begin shifting I-75 North between Lyons and Pen…
Since Fri, Jul 24, 12:00 AM EDT
On Friday, July 24, the contractor will begin shifting I-75 North between Lyons and Pennyroyal to the right in order to install barrier wall. During the shift, motorists traveling North on I-75 will not have access to the entrance or exit ramps at Austin Landing Boulevard and the interchange at I-75/I-675. This work is expected to be completed by mid-morning, Saturday, July 25, and access will …
State DOT work zone feeds (WZDx) · OH · updated July 24, 2026
I-75 by email, every morning
Crashes, chain controls and closures on I-75 at 6:00 AM Eastern. Free, and one click to stop.
More options: more highways, states, or Mondays only.
What we cover in Ohio
- Work zones and lane closuresLive · State DOT work zone feeds (WZDx), ODOT (OHGO), OHGO message signs (Ohio), WV511 (WVDOT), National Park Service
- Crashes and incidentsLive · State DOT work zone feeds (WZDx), ODOT (OHGO), OHGO message signs (Ohio), WV511 (WVDOT), National Park Service
- Chain controlsNot connected yet
About I-75 in Ohio
I-75 is an Interstate highway: Miami to Sault Ste. Marie, through Tampa, Atlanta, Cincinnati and Detroit. Beyond Ohio it also crosses Florida, Georgia, Tennessee, Kentucky and Michigan.
This page lists what Ohio's official sources report on I-75, in order along the road: crashes and incidents, full closures, lane closures and work zones, and planned work. When a list is empty, those sources had nothing on I-75 at the last check, November 24, 2026, 5:14 AM EST.
Official sources checked in Ohio
Crashes and incidents: ODOT (OHGO).Work zones and lane closures: Ohio DOT work zone feed (WZDx).Official traveler information: OHGO.Weather alerts: National Weather Service.