I-691 traffic and crashes, live
Closures, crashes, chain controls and work zones on I-691, state by state.
Is I-691 closed right now?
In places. 3 full closures are reported on sections, ramps or crossings of I-691: I-691: Planned, I-691E_X-1B_S-15 (Connecticut); I-691: Planned, I-691E_X-2B_OFF (Connecticut), and more below.
- 3
- Full closures
- 0
- Crashes and incidents
- 6
- Work zones
- 0
- Planned work
Checked 2:38 AM EST. 9 entries in all. Latest update 3 hr ago.
Crashes, incidents and chain controls now 0
I-691 by email, every morning
Crashes, chain controls and closures on I-691 at 6:00 AM Eastern. Free, and one click to stop.
More options: more highways, states, or Mondays only.
Crashes on I-691 in the last 48 hours
No crash on I-691 from our official sources in the last 48 hours.
From our archive of official reports, cleared ones included. Not every crash is reported by a state feed.
Official detours on I-691 now
Wilbur Cross Parkway northbound: Road closed
Reconstruction on Wilbur Cross Parkway, northbound, Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound…
State 511 systems (CARS: 511NY, INDOT, KDOT, MnDOT, MassDOT, NDOT, TDOT) · Connecticut
In the words of the state's own report. Follow the signs on the road, which always win.
I-691 by state
Fully closed for work now 3
- Full closure
I-691: Planned, I-691E_X-2B_OFF
Since Mon, Nov 23, 11:36 PM EST
MERIDEN - I-691 Eastbound Exit 2B OFFRAMP CLOSED because of Road Work. Reported Monday, November 23 at 11:36 pm. · No Data
State 511 system · CT · updated 3 hr ago
- Full closure
I-691: Planned, I-691E_X-1B_S-15
Since Mon, Nov 23, 9:47 PM EST
MERIDEN - I-691 Eastbound Exit 1B To RT 15 South Ramp CLOSED because of Road Work. Reported Monday, November 23 at 9:47 pm. · No Data
State 511 system · CT · updated 4 hr ago
- Full closure
I-691E_X1B_S15: Road closed
Until Sep 12, 2030, 8:07 PM EDT
I-691E_X1B_S15: Road closed. I-691 Eastbound Exit 1B To RT 15 South Ramp CLOSED because of Road Work. Reported Monday, November 23 at 9:47 pm.
511NY (NYSDOT / TRANSCOM) · CT · updated 4 hr ago
Lane closures and work zones 6
- Work zoneboth directions
I-691 in both directions: Road reconstruction
Until Nov 30, 2028, 11:59 PM EST
I-691 in both directions: Road reconstruction. Reconstruction on I-691, both directions, between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM, All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM, All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM, All lanes open.
511NY (NYSDOT / TRANSCOM) · CT · updated March 13, 2025
- Lane closurewestbound
I-691 westbound: Road closed
Until Aug 15, 2027, 11:59 PM EDT
I-691 westbound: Road closed. Guard rail repairs and noise wall construction on I-691, westbound, Entrance ramp Exit 4 - CT 66/CT 322 (Southington), Wednesday October 28th, 2026 thru Sunday August 15th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM, All lanes closed, Wednesday October 28th, 2026 thru Sunday August 15th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM, All lanes closed.
511NY (NYSDOT / TRANSCOM) · CT · updated October 28, 2026
- Work zonewestbound
I-691 westbound: Road maintenance operations
Until Aug 15, 2027, 11:59 PM EDT
I-691 westbound: Road maintenance operations. Guard rail repairs and noise wall construction on I-691, westbound, between Exit 5 - CT 71 North (Meriden) and Exit 3 - CT 10 (Cheshire), Wednesday October 28th, 2026 thru Sunday August 15th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM, right shoulder closed, Wednesday October 28th, 2026 thru Sunday August 15th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM, right shoulder closed.
511NY (NYSDOT / TRANSCOM) · CT · updated October 28, 2026
- Work zoneeastbound
Planned, I-691 Eastbound
Since Mon, Nov 23, 9:17 PM EST
MERIDEN - Road Work on I-691 Eastbound between Exits 2B and 1A (2.3 miles) in effect today until Tuesday, November 24 at 6:00 am. The right lane is closed. Reported Monday, November 23 at 9:17 pm. · No Data
State 511 system · CT · updated 5 hr ago
- Lane closurenorthbound
Wilbur Cross Parkway northbound: Road closed
Until Nov 30, 2028, 11:59 PM EST
Wilbur Cross Parkway northbound: Road closed. Reconstruction on Wilbur Cross Parkway, northbound, Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM, All lanes closed.
511NY (NYSDOT / TRANSCOM) · CT · updated March 13, 2025
- Work zonewestbound
Planned, I-691 Westbound
Since Mon, Nov 23, 8:00 PM EST
MERIDEN - Road Work on I-691 Westbound before Exit 2A (1.1 miles) in effect today until Tuesday, November 24 at 6:30 am. The left lane is closed. Reported Monday, November 23 at 7:58 pm. · No Data
State 511 system · CT · updated 6 hr ago
The last 90 days on I-691
102
reports
78
closures
17
crashes
15 hr ago
latest report
I-691 gets the most reports on Mondays (22% of the week's), and most of them start between 6 p.m. and 9 p.m.
I-691 has too few crash reports for a figure of its own; across the US, half are cleared within about 45 minutes, four in five within 2 hours.
A closure on I-691 typically lasts about 6 hours; four in five are over within 10 hours.
Most reports on I-691 come from Connecticut (99, 97%), then New York (3).
From every report Live Roads archived from official sources on I-691 in the last 90 days. Days and hours are local time.
Latest reports on I-691
Planned · I-691 Westbound
Closure · November 23, 2026, 11:01 AM EST · about 2 hours · Connecticut
Traffic incident · I-691 westbound
Traffic · November 19, 2026, 5:45 PM EST · about 45 minutes · Connecticut
Incident · I-691 Westbound
Crash · November 19, 2026, 5:45 PM EST · about 30 minutes · Connecticut
Closed · I-691 westbound
Closure · November 18, 2026, 9:01 PM EST · under 15 minutes · Connecticut
Driving tips for I-691
When to drive it. If your trip can move, avoid I-691 from 6 p.m. to 9 p.m., above all on Mondays: that is when most reports start. The quietest day on I-691 is Saturday. From Live Roads' record of 102 reports in 90 days.
The rules change at each state line. I-691 crosses 2 states with these rules on file, each from the state's own statute, DOT or state police:
| State | Top speed limit for cars | Left lane | Winter |
|---|---|---|---|
| Connecticut | 65 mph, on multilane limited-access highways | Slower traffic keeps right, on all highways (Gen. Stat. §14-230) | No chain or stud rule on file |
| New York | 65 mph | Slower traffic keeps right, on all roads (VTL §1120(b)) | Studded tires: October 16 to April 30. |
Speed limits checked on October 19, 2026, left lane laws on November 2, 2026, chain and studded tire rules on October 15, 2026. The posted sign always wins.
About I-691
I-691 is an auxiliary Interstate highway. It crosses 2 states: Connecticut and New York.
Live Roads USA reads each state's official feeds every minute and lists what they report on I-691: full closures first, then crashes and incidents, chain controls, lane closures and work zones, and planned work. When a list here is empty, the sources below had nothing on I-691 at the last check, November 24, 2026, 2:38 AM EST. A state marked as not connected is unknown, not clear.
Official sources checked, state by state
- I-691 in Connecticut
- Crashes and incidents: CTroads.Work zones and lane closures: CTroads.Official traveler information: CTroads.
- I-691 in New York
- Crashes and incidents: 511NY.Work zones and lane closures: 511NY and NYC DOT.Official traveler information: 511NY.
Questions about I-691
How is traffic on I-691 right now?
In places. 3 full closures are reported on sections, ramps or crossings of I-691: I-691: Planned, I-691E_X-1B_S-15 (Connecticut); I-691: Planned, I-691E_X-2B_OFF (Connecticut), and more below.
Was there a crash on I-691 today?
Our official sources show no crash on I-691 in the last 48 hours. Not every crash is reported by a state feed.
Is I-691 closed today?
In places: I-691: Planned, I-691E_X-1B_S-15 (Connecticut); I-691: Planned, I-691E_X-2B_OFF (Connecticut); I-691E_X1B_S15: Road closed (Connecticut).
When does I-691 have the most crashes and closures?
I-691 gets the most reports on Mondays (22% of the week's), and most of them start between 6 p.m. and 9 p.m. The quietest day on I-691 is Saturday. Based on every report in the last 90 days.
How long does a crash on I-691 take to clear?
I-691 has too few crash reports for a figure of its own; across the US, half are cleared within about 45 minutes, four in five within 2 hours.
Ask about I-691
Ask about I-691. I answer from live data only.
Ask in any language · Pregunta en tu idioma
Answers are generated from the public sources we aggregate and may contain errors or delays. Not navigation or advice. In an emergency, call 911.