I-275 road conditions
Closures, crashes, chain controls and work zones on I-275, state by state.
1 full closure on I-275 now
45 entries in all. Latest update 3 min ago.
I-275 by state
I-275 by email, every morning
Crashes, chain controls and closures on I-275 at 6:00 AM Eastern. Free, and one click to stop.
More options: more highways, states, or Mondays only.
Crashes, incidents and chain controls now 2
- Lane closurewestbound
Disabled Vehicle, I-275 Westbound
Since Fri, Oct 9, 12:50 PM EDT
The right lane is blocked on I-275 West beyond Five Mile Rd, due to a disabled vehicle. · Road status: Restricted
ODOT (OHGO) · OH · updated 3 min ago
- Lane closureeastbound
Crash, I-275 Eastbound
Since Fri, Oct 9, 11:42 AM EDT
The right lane is blocked on I-275 East at I-71, due to a crash. · Road status: Restricted
ODOT (OHGO) · OH · updated 3 min ago
Fully closed for work now 1
Lane closures and work zones 42
- Work zone
I 275/US 19 Fr N of Skyway Fishing Pier to S of Pinellas Poi Nt Dr - Miscellaneous Cons…
Since Nov 17, 2025, 12:00 AM EST
I 275/US 19 FR N OF SKYWAY FISHING PIER TO S OF PINELLAS POI NT DR - MISCELLANEOUS CONSTRUCTION
State DOT work zone feeds (WZDx) · FL · updated 59 min ago
- Work zonenorthbound
I-275: 62nd Avenue North
Since Sun, Sep 27, 12:00 AM EDT
62nd Ave N approaching and under I-275 overpass - Right Lane closed in each direction. Contact: FDOT Maddie Griffin 727-575-8334
State DOT work zone feeds (WZDx) · FL · updated September 27, 2026
- Work zone
I-275 (SR 93) from N OF 38TH Ave N to N OF 4TH St N - Add La Nes & Reconstruct
Since Aug 11, 2025, 1:00 AM EDT
I-275 (SR 93) FROM N OF 38TH AVE N TO N OF 4TH ST N - ADD LA NES & RECONSTRUCT
State DOT work zone feeds (WZDx) · FL · updated 59 min ago
- Work zone
I-275: WP-03 Pier 2-18 Traffic Shift SR-60 and Shaft operations
Since Apr 17, 2023, 1:00 AM EDT
WP-03 Pier 2-18 Traffic Shift SR-60 and Shaft operations
State DOT work zone feeds (WZDx) · FL · updated 3 days ago
- Work zone
I-275: Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport.
Since Apr 17, 2023, 1:00 AM EDT
Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport. The detour is implemented by eliminating the access to the left lane and closing the right with a taper per plan.
State DOT work zone feeds (WZDx) · FL · updated April 20, 2026
- Work zone
I-275: Detour of 275NB Off-ramp to SR60 and 589N.
Since Apr 17, 2023, 1:00 AM EDT
Detour of 275NB Off-ramp to SR60 and 589N. Airport. The detour is implemented by eliminating the access to the left lane of the ramp and closing the right lane with a tamper per plan.
State DOT work zone feeds (WZDx) · FL · updated September 28, 2026
- Work zone
I-275: Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport.
Since Apr 17, 2023, 1:00 AM EDT
Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport. The detour is implemented by eliminating the access to the left lane and closing the right with a taper per plan.
State DOT work zone feeds (WZDx) · FL · updated April 20, 2026
- Work zone
I-275: Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport.
Since Apr 17, 2023, 1:00 AM EDT
Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport. The detour is implemented by eliminating the access to the left lane and closing the right with a taper per plan.
State DOT work zone feeds (WZDx) · FL · updated April 15, 2026
- Work zone
I-275: Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport.
Since Apr 17, 2023, 1:00 AM EDT
Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport. The detour is implemented by eliminating the access to the left lane and closing the right with a taper per plan.
State DOT work zone feeds (WZDx) · FL · updated April 16, 2026
- Work zone
I-275: Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport.
Since Apr 17, 2023, 1:00 AM EDT
Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport. The detour is implemented by eliminating the access to the left lane and closing the right with a taper per plan.
State DOT work zone feeds (WZDx) · FL · updated April 15, 2026
- Work zone
I-275: Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport.
Since Apr 17, 2023, 1:00 AM EDT
Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport. The detour is implemented by eliminating the access to the left lane and closing the right with a taper per plan.
State DOT work zone feeds (WZDx) · FL · updated April 15, 2026
- Work zone
I-275: 275 NB Outside Lane - Copy
Since Apr 17, 2023, 1:00 AM EDT
275 NB Outside Lane - COPY
State DOT work zone feeds (WZDx) · FL · updated April 14, 2026
- Work zone
I-275: Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport.
Since Apr 17, 2023, 1:00 AM EDT
Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport. The detour is implemented by eliminating the access to the left lane and closing the right with a taper per plan.
State DOT work zone feeds (WZDx) · FL · updated April 13, 2026
- Work zone
I-275: Left lane closure to unload materials for shoulder work.
Since Apr 17, 2023, 1:00 AM EDT
Left lane closure to unload materials for shoulder work.
State DOT work zone feeds (WZDx) · FL · updated June 18, 2026
- Work zone
I-275: Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport.
Since Apr 17, 2023, 1:00 AM EDT
Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport. The detour is implemented by eliminating the access to the left lane and closing the right with a taper per plan.
State DOT work zone feeds (WZDx) · FL · updated March 6, 2026
- Work zone
I-275: Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport.
Since Apr 17, 2023, 1:00 AM EDT
Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport. The detour is implemented by eliminating the access to the left lane and closing the right with a taper per plan.
State DOT work zone feeds (WZDx) · FL · updated March 5, 2026
- Work zone
I-275: Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport.
Since Apr 17, 2023, 1:00 AM EDT
Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport. The detour is implemented by eliminating the access to the left lane and closing the right with a taper per plan.
State DOT work zone feeds (WZDx) · FL · updated March 5, 2026
- Work zone
I-275: Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport.
Since Apr 17, 2023, 1:00 AM EDT
Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport. The detour is implemented by eliminating the access to the left lane and closing the right with a taper per plan.
State DOT work zone feeds (WZDx) · FL · updated March 3, 2026
- Work zone
I-275: Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport.
Since Apr 17, 2023, 1:00 AM EDT
Detour of 275 NB Off-Ramp to SR60 West and 589 North Airport. The detour is implemented by eliminating the access to the left lane and closing the right with a taper per plan.
State DOT work zone feeds (WZDx) · FL · updated March 2, 2026
- Work zone
I-275: 275 NB Outside Lane
Since Apr 17, 2023, 1:00 AM EDT
275 NB Outside Lane
State DOT work zone feeds (WZDx) · FL · updated August 26, 2026
- Work zone
I-275: Design soil boring for future overhead sign structure for express lane in Twi.
Since Apr 17, 2023, 1:00 AM EDT
Design soil boring for future overhead sign structure for express lane in TWI. Boring will be in existing inside travel lane and will be patched following boring prior to opening traffic
State DOT work zone feeds (WZDx) · FL · updated February 6, 2026
- Work zone
I-275/SR 93 SB/I-4/SR 400 WB from N of Morgan St to W of N 1 2TH St - Interchange - Add…
Since Sep 26, 2022, 1:00 AM EDT
I-275/SR 93 SB/I-4/SR 400 WB FROM N OF MORGAN ST TO W OF N 1 2TH ST - INTERCHANGE - ADD LANES
State DOT work zone feeds (WZDx) · FL · updated 59 min ago
- Work zone
I-275/SR 93 SB/I-4/SR 400 WB from N of Morgan St to W of N 1 2TH St - Interchange - Add…
Since Sep 26, 2022, 1:00 AM EDT
I-275/SR 93 SB/I-4/SR 400 WB FROM N OF MORGAN ST TO W OF N 1 2TH ST - INTERCHANGE - ADD LANES
State DOT work zone feeds (WZDx) · FL · updated 59 min ago
- Work zone
I-275/SR 93 SB Off Ramp to I-4 Fr N of Floribraska to W OF 2 1ST - Interchange - Add Lanes
Since Sep 26, 2022, 1:00 AM EDT
I-275/SR 93 SB OFF RAMP TO I-4 FR N OF FLORIBRASKA TO W OF 2 1ST - INTERCHANGE - ADD LANES
State DOT work zone feeds (WZDx) · FL · updated 59 min ago
- Work zone
I-275/SR 93 SB/I-4/SR 400 WB from N of Morgan St to W of N 1 2TH St - Interchange - Add…
Since Sep 26, 2022, 1:00 AM EDT
I-275/SR 93 SB/I-4/SR 400 WB FROM N OF MORGAN ST TO W OF N 1 2TH ST - INTERCHANGE - ADD LANES
State DOT work zone feeds (WZDx) · FL · updated 59 min ago
- Work zone
I-275/SR 93 SB Off Ramp to I-4 Fr N of Floribraska to W OF 2 1ST - Interchange - Add Lanes
Since Sep 26, 2022, 1:00 AM EDT
I-275/SR 93 SB OFF RAMP TO I-4 FR N OF FLORIBRASKA TO W OF 2 1ST - INTERCHANGE - ADD LANES
State DOT work zone feeds (WZDx) · FL · updated 59 min ago
- Work zone
I-275/SR 93 SB/I-4/SR 400 WB from N of Morgan St to W of N 1 2TH St - Interchange - Add…
Since Sep 26, 2022, 1:00 AM EDT
I-275/SR 93 SB/I-4/SR 400 WB FROM N OF MORGAN ST TO W OF N 1 2TH ST - INTERCHANGE - ADD LANES
State DOT work zone feeds (WZDx) · FL · updated 59 min ago
- Work zone
I-275/SR 93 SB Off Ramp to I-4 Fr N of Floribraska to W OF 2 1ST - Interchange - Add Lanes
Since Sep 26, 2022, 1:00 AM EDT
I-275/SR 93 SB OFF RAMP TO I-4 FR N OF FLORIBRASKA TO W OF 2 1ST - INTERCHANGE - ADD LANES
State DOT work zone feeds (WZDx) · FL · updated 59 min ago
- Work zone
I-275: Row-25-0000857
Since Sun, Jan 11, 9:00 AM EST
ROW-25-0000857 Bridge Work
State DOT work zone feeds (WZDx) · FL · updated September 4, 2026
- Lane closureeastbound
A paving project on I-275 East, between the U.S.
Since Mon, Apr 13, 8:00 PM EDT
A paving project on I-275 East, between the U.S. 52 and Five Mile Road interchanges. Traffic will be maintained in a minimum of one lane during evening and overnight hours of operation.
State DOT work zone feeds (WZDx) · OH · updated April 1, 2026
- Lane closurewestbound
A paving project on I-275 East, between the U.S.
Since Mon, Apr 13, 8:00 PM EDT
A paving project on I-275 East, between the U.S. 52 and Five Mile Road interchanges. Traffic will be maintained in a minimum of one lane during evening and overnight hours of operation.
State DOT work zone feeds (WZDx) · OH · updated April 1, 2026
- Work zonewestbound
I-275 East between MM 73.1 and 73.3 in Campbell County
Since Mon, Oct 5, 9:00 AM EDT
State DOT work zone feeds (WZDx) · KY · updated 6 days ago
- Work zonewestbound
I-275 East between MM 73.5 and 73.1 Area of Combs-Hehl Bridge in Campbell County
Since Mon, Oct 5, 9:00 AM EDT
State DOT work zone feeds (WZDx) · KY · updated 3 days ago
- Lane closureeastbound
I-275: A 16-foot height restriction will be in effect on the Branch Hill Miamiville Road bridg…
Since Wed, Sep 30, 12:00 AM EDT
A 16-foot height restriction will be in effect on the Branch Hill Miamiville Road bridges over I-275. Traffic on I-275 will be maintained through the work zone.
State DOT work zone feeds (WZDx) · OH · updated September 30, 2026
- Work zonenorthbound
A bridge rehabilitation project on Branch Hill Miamiville Road over I-275.
Since Mon, Mar 9, 12:00 AM EDT
A bridge rehabilitation project on Branch Hill Miamiville Road over I-275. Traffic on I-275 will be maintained with shoulder closures and periodic lane closures. Branch Hill Miamiville Road is closed through mid-September 2026.
State DOT work zone feeds (WZDx) · OH · updated September 1, 2026
- Work zonesouthbound
A bridge rehabilitation project on Branch Hill Miamiville Road over I-275.
Since Mon, Mar 9, 12:00 AM EDT
A bridge rehabilitation project on Branch Hill Miamiville Road over I-275. Traffic on I-275 will be maintained with shoulder closures and periodic lane closures. Branch Hill Miamiville Road is closed through mid-September 2026.
State DOT work zone feeds (WZDx) · OH · updated September 1, 2026
- Lane closurewestbound
I-275: A 16-foot height restriction will be in effect on the Branch Hill Miamiville Road bridg…
Since Wed, Sep 30, 12:00 AM EDT
A 16-foot height restriction will be in effect on the Branch Hill Miamiville Road bridges over I-275. Traffic on I-275 will be maintained through the work zone.
State DOT work zone feeds (WZDx) · OH · updated September 30, 2026
- Lane closureeastbound
A resurfacing project on I-275 East and West, between the I-75 and U.S.
Since Mon, Mar 16, 7:00 PM EDT
A resurfacing project on I-275 East and West, between the I-75 and U.S. 42/Lebanon Road interchanges. Traffic is being maintained in a minimum of one lane in either direction during evening and overnight hours. Various ramp closures may be in effect nightly, from 10 p.m. to 5 a.m. All work is scheduled to be completed in October.
State DOT work zone feeds (WZDx) · OH · updated April 24, 2026
- Lane closurewestbound
A resurfacing project on I-275 East and West, between the I-75 and U.S.
Since Mon, Mar 16, 7:00 PM EDT
A resurfacing project on I-275 East and West, between the I-75 and U.S. 42/Lebanon Road interchanges. Traffic is being maintained in a minimum of one lane in either direction during evening and overnight hours. Various ramp closures may be in effect nightly, from 10 p.m. to 5 a.m. All work is scheduled to be completed in October.
State DOT work zone feeds (WZDx) · OH · updated April 24, 2026
- Lane closurenorthbound
I-275: Springfield Pike
Since Wed, Sep 16, 8:00 PM EDT
A bridge repair project on I-275 on the westbound structure carrying traffic over S.R. 4 (Springdale Pike). Traffic on I-275 and S.R. 4 will be maintained, with intermittent restrictions during the evening and overnight hours. Ramps will be subject to overnight hours, and two weekend closures will be in effect on the ramps from southbound S.R. 4 to eastbound I-275 and from northbound S.R. 4 to …
State DOT work zone feeds (WZDx) · OH · updated September 16, 2026
- Lane closuresouthbound
I-275: Springfield Pike
Since Wed, Sep 16, 8:00 PM EDT
A bridge repair project on I-275 on the westbound structure carrying traffic over S.R. 4 (Springdale Pike). Traffic on I-275 and S.R. 4 will be maintained, with intermittent restrictions during the evening and overnight hours. Ramps will be subject to overnight hours, and two weekend closures will be in effect on the ramps from southbound S.R. 4 to eastbound I-275 and from northbound S.R. 4 to …
State DOT work zone feeds (WZDx) · OH · updated September 16, 2026
- Lane closurewestbound
A bridge repair project on I-275 on the westbound structure carrying traffic over S.R.
Since Wed, Sep 16, 8:00 PM EDT
A bridge repair project on I-275 on the westbound structure carrying traffic over S.R. 4 (Springdale Pike). Traffic on I-275 and S.R. 4 will be maintained, with intermittent restrictions during the evening and overnight hours. Ramps will be subject to overnight hours, and two weekend closures will be in effect on the ramps from southbound S.R. 4 to eastbound I-275 and from northbound S.R. 4 to …
State DOT work zone feeds (WZDx) · OH · updated September 16, 2026