CO-52 Colorado
Closures, crashes, chain controls and work zones on CO-52 in Colorado, in order along the road.
CO-52 in Colorado: 2 full closures now
As of 4:47 PM MST. 7 entries; latest update 3 days ago.
Crashes, incidents and chain controls now 0
Fully closed for work now 2
- Full closurewestbound
Road Construction, road closed, CO-52, between US 85 and County Road 23 (Fort Lupton) from Mile Point 19.9 to…
Until Mon, Nov 23, 5:00 PM MST
Between US 85 and County Road 23 (Fort Lupton) from Mile Point 19.9 to Mile Point 19.7. Road closed due to road construction. Starting Monday at 7:00AM MST until Monday, at about 5:00PM MST.
CDOT / COtrip · CO · updated 3 days ago
- Full closure
Road Construction, road closed, CO-52, between Hudson Drive and Holly Street (Hudson) from Mile Point 29.52…
Until Sat, Nov 28, 11:59 PM MST
Between Hudson Drive and Holly Street (Hudson) from Mile Point 29.52 to Mile Point 30.05. Road closed due to road construction. Starting Sunday at 12:00AM MST until November 28, 2026 at about 11:59PM MST. Comment: Full closure of Main Street (CO 52) between I-76 Frontage Road and Holly Street in Hudson through late November for revitalization work. Detour using I-76 Frontage Road and County Road 51. Local access to town via County Road 47, County Road 10, and County Road 45 (Beech Street).
CDOT / COtrip · CO · updated 4 days ago
Lane closures and work zones 2
- Work zoneeastbound
Road Construction, CO-52, between I-25 (Frederick) and Grand Avenue (Fort Lupton) from Mile Point 11.5 to…
Until Wed, Nov 25, 11:59 PM MST
Between I-25 (Frederick) and Grand Avenue (Fort Lupton) from Mile Point 11.5 to Mile Point 20. Road construction. Until November 25, 2026 at about 11:59PM MST. Comment: CO 52 resurfacing construction zone, expect delays, traffic shifts, shoulder work
CDOT / COtrip · CO · updated 3 days ago
- Lane closureeastbound
Paving Operations, CO-52
Until Mon, Nov 23, 5:00 PM MST
Between County Road T (near Fort Morgan) and County Road AA (3 miles east of the Saddle Ridge area) from Mile Point 88 to Mile Point 95. Paving operations. Alternating traffic. Width limit in effect. Width limit 11'0". Starting November 23, 2026 at 7:00AM MST until November 23, 2026 at about 5:00PM MST. Comment: Various lane closures will be in place along CO 52. In four-lane sections, traffic will be shifted into a head-to-head configuration, with two lanes closed. Along two-lane sections, motorists can expect alternating, single-lane traffic controlled by flaggers. Delays of up to 15 minutes
CDOT / COtrip · CO · updated 6 days ago
Planned work 3
- Full closurewestbound
Road Construction, road closed, CO-52, between US 85 and County Road 23 (Fort Lupton) from Mile Point 19.9 to…
Starts Tue, Nov 24, 7:00 AM MST
Between US 85 and County Road 23 (Fort Lupton) from Mile Point 19.9 to Mile Point 19.7. Road closed due to road construction. Starting November 24, 2026 at 7:00AM MST until November 24, 2026 at about 5:00PM MST.
CDOT / COtrip · CO · updated 3 days ago
- Lane closureeastbound
Paving Operations, CO-52
Starts Tue, Nov 24, 7:00 AM MST
Between County Road T (near Fort Morgan) and County Road AA (3 miles east of the Saddle Ridge area) from Mile Point 88 to Mile Point 95. Paving operations. Alternating traffic. Width limit in effect. Width limit 11'0". Starting November 24, 2026 at 7:00AM MST until November 24, 2026 at about 5:00PM MST. Comment: Various lane closures will be in place along CO 52. In four-lane sections, traffic will be shifted into a head-to-head configuration, with two lanes closed. Along two-lane sections, motorists can expect alternating, single-lane traffic controlled by flaggers. Delays of up to 15 minutes
CDOT / COtrip · CO · updated 6 days ago
- Lane closureeastbound
Paving Operations, CO-52
Starts Wed, Nov 25, 7:00 AM MST
Between County Road T (near Fort Morgan) and County Road AA (3 miles east of the Saddle Ridge area) from Mile Point 88 to Mile Point 95. Paving operations. Alternating traffic. Width limit in effect. Width limit 11'0". Starting November 25, 2026 at 7:00AM MST until November 25, 2026 at about 5:00PM MST. Comment: Various lane closures will be in place along CO 52. In four-lane sections, traffic will be shifted into a head-to-head configuration, with two lanes closed. Along two-lane sections, motorists can expect alternating, single-lane traffic controlled by flaggers. Delays of up to 15 minutes
CDOT / COtrip · CO · updated 6 days ago
CO-52 by email, every morning
Crashes, chain controls and closures on CO-52 at 6:00 AM Eastern. Free, and one click to stop.
More options: more highways, states, or Mondays only.
What we cover in Colorado
- Work zones and lane closuresLive · CDOT / COtrip, National Park Service, Local news report, Denver DOTI (street occupancy permits), National Weather Service
- Crashes and incidentsLive · CDOT / COtrip, National Park Service, Local news report, Denver DOTI (street occupancy permits), National Weather Service
- Chain controlsLive · CDOT / COtrip, National Park Service, Local news report, Denver DOTI (street occupancy permits), National Weather Service
About CO-52 in Colorado
CO-52 is a Colorado state route. It lies wholly in Colorado, so this page covers all of it.
This page lists what Colorado's official sources report on CO-52, in order along the road: crashes and incidents, full closures, lane closures and work zones, and planned work. When a list is empty, those sources had nothing on CO-52 at the last check, November 23, 2026, 4:47 PM MST.
Official sources checked in Colorado
Crashes and incidents: CDOT / COtrip.Work zones and lane closures: CDOT / COtrip.Chain controls: CDOT / COtrip.Official traveler information: COtrip, or dial 511 in the state.Weather alerts: National Weather Service.